References

Vard Tulcea SA, Romania, 2013 - Painting


In 2013, Vard Tulcea SA partnered with Minex Group to implement modern solutions dedicated to painting processes, ensuring increased efficiency and compliance with environmental standards.

Supplied equipment:

  • 2 complete washing booths equipped with a decanter system, water/oil separator, and filtration system;
  • 2 painting booths for complex and efficient applications;
  • 4 drying booths designed to ensure uniform and fast finishes.

Achieved benefits:

  • Process efficiency: The implemented solutions optimize each stage of the painting process, from washing to drying, guaranteeing high-quality results.
  • Increased productivity: Efficient workflow organization, using the painting and drying booths, reduced processing times and increased production capacity.
  • Energy efficiency: The booths are designed with modern technologies that reduce energy consumption, contributing to significant operational cost savings.
  • Improved working conditions: Advanced filtration and separation systems provide a safer and cleaner work environment for operators, eliminating impurities and harmful vapors.
  • Environmental protection: The integrated water/oil separation and filtration systems help meet environmental regulations, minimizing the impact on ecosystems.

Through this project, Vard Tulcea SA strengthened its position as one of the most important shipbuilders in the region, demonstrating its commitment to sustainability and innovation.


Vard Tulcea SA, Romania, 2013 - Painting image wide
Vard Tulcea SA, Romania, 2013 - Painting image 1
Vard Tulcea SA, Romania, 2013 - Painting image 2
Vard Tulcea SA, Romania, 2013 - Painting image 3
Vard Tulcea SA, Romania, 2013 - Painting image 4