Heurtey Petrochem Romania SRL, Romania - Painting
The project for Heurtey Petrochem Romania SRL involved the design, technical consultancy, and support for the construction of a new painting facility within the heavy chemical equipment manufacturing plant. The solutions provided included the delivery of exhaust and heating units equipped with rotors for thermal energy recovery and a central control panel.
The implementation of these solutions brought significant improvements to the painting process’s efficiency. The exhaust and heating units enable precise control of temperature and ventilation, optimizing paint application and drying. The integrated thermal energy recovery rotors reduce heat loss, enhancing the energy efficiency of the entire process.
Productivity increased due to advanced technologies that ensure a continuous and well-organized workflow within the painting facility. The central control panel allows real-time monitoring and management of operations, reducing intervention times and improving overall performance.
Energy efficiency was enhanced through the use of thermal energy recovery systems, which reduce energy consumption and lower operational costs. These solutions support sustainability goals and contribute to a reduced environmental impact.
Working conditions were significantly improved with the implementation of efficient ventilation systems that reduce vapor and particle concentrations in the air. Operators benefit from a safer and more comfortable environment, which contributes to increased satisfaction and productivity.
Environmental protection was prioritized through the implemented technologies that minimize pollutant emissions and optimize resource management. The delivered solutions comply with the strictest environmental standards, reducing the processes’ impact on the ecosystem and the local community.