Ex Bc DOO, Serbia - Painting
Since 2005, EX BC has been one of the largest manufacturers of metal structures in Serbia. Minex provided design services, technical consulting, delivery, and installation of the equipment necessary to equip a painting hall measuring 80 x 20 x 6.4 m.
The solutions delivered by Minex included modern ventilation and filtration systems, heating and exhaust units, as well as specialized equipment for paint preparation and application. These systems were integrated to ensure efficient operations and superior performance.
The implementation of these solutions significantly improved process efficiency, enabling a continuous and well-organized workflow. The painting hall provides optimal conditions for uniform paint application, reducing waste and ensuring high-quality results.
Productivity was increased through the use of state-of-the-art equipment that minimizes the time required for paint preparation and application operations. Operators benefit from a well-organized environment, contributing to overall operational efficiency.
Energy efficiency was enhanced through the use of high-performance heating and exhaust units, which reduce energy consumption and optimize resource usage. These systems help lower long-term operational costs.
Working conditions were significantly improved by reducing the concentration of vapors and particles in the air. Advanced ventilation ensures a safe and comfortable environment for operators, protecting their health.
Environmental protection was prioritized through the use of technologies that minimize pollutant emissions and optimize waste management. The solutions implemented by Minex support compliance with the strictest environmental standards and reduce the impact on the local community and ecosystem.