EURO GAS SYSTEM Targu Mures
In 2012, Mures Industrial Park was rented by EURO GAS System, who invested 6 million EUR upgrading works. The partnership with with Euro Gas started in 2010, when Minex fully equipped their painting/drying hall of 11m x 5m x 5m.
Further cooperation referred to designing and further equipping a blasting hall of 12m x 4m x4m and another painting/ drying hall of 15m x 7m x 5m.
A blast pot, a recovery system, a transport and abrasive cleaning system have been installed in the blasting hall.
Heating and exhausting units have been included in the painting halls.
Further investments in 2013 referred to a third drying/painting hall of 15m x 7m x 5m, fully equipped with heating and exhausting units, electrical board, associated piping and related machinery.