24 Ianuarie SA, Romania - Blasting and Painting
24 Ianuarie SA adopted the technical solution designed by Minex Group for the modernization of a blasting hall measuring 18 x 6 x 6 m, the construction of a new fully equipped painting hall measuring 12 x 5 x 5 m, and the installation of a roller conveyor blasting machine for plates and profiles. The implementation of these solutions has brought significant improvements.
The implemented equipment includes:
- Modernization of a blasting hall with dimensions of 18 x 6 x 6 m.
- Construction of a fully equipped painting hall with dimensions of 12 x 5 x 5 m.
- Installation of a roller conveyor blasting machine for plates and profiles.
The delivered solutions improved process efficiency by increasing production capacity by 35%. The integrated modern technologies ensure a faster and better-organized operational flow, enabling higher levels of productivity.
Productivity has increased by reducing operation times and optimizing resource utilization. Operators benefit from a better-organized working environment, allowing for the management of large production volumes in a shorter time while maintaining high-quality standards.
Energy efficiency has been significantly improved due to the new technologies used, which reduce energy consumption and minimize losses. The automation of processes and the use of high-energy-performance equipment contribute to lowering operational costs.
Working conditions have been considerably improved through the modernization of halls and ventilation and lighting systems. These changes enhance operator comfort and safety, reducing health risks and providing a more pleasant working environment.
Environmental protection has been prioritized by reducing the impact of volatile organic compounds from paints on the environment. The implemented solutions include eco-friendly technologies that limit pollutant emissions and improve waste management generated during production processes.